§ 120-2. Permits required.  


Latest version.
  • A. 
    A permit shall be required for use of a portable storage unit within the Town of Malta. One such unit shall be allowed on a lot if there is a valid building permit issued by the Town of Malta, and such use may only continue so long as that building permit remains valid. Upon the expiration of the building permit, or if more than one storage unit is placed on the site, a separate permit for the storage unit shall be required.
    B. 
    A permit shall be obtained from the Town of Malta Building and Planning Department prior to the placement of the portable storage unit on a parcel of land in the Town of Malta. A permit specifically issued for the use of a portable storage unit shall be effective for a period of one month at no cost. Such permit may be renewed for an additional one month at a cost as set forth in Table A to Chapter 88. No additional renewals shall be permitted, and no additional permit issued in the same calendar year if such permit would result in a portable storage unit being on the same parcel for more than two months in such calendar year.
Amended 11-3-2010 by L.L. No. 9-2010